 |
 |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
 |
| |
| |
13790 Roosevelt Blvd.
Clearwater, FL 33762 |
| |
P: 727.573.3612
F: 727.573.7734 |
| |
GC# CGC008702 |
| |
|
|
 |

Theme Park Projects
 |
KaTonga Theater
Tampa, FL |
|
 |
KaTonga takes you on a journey to the heart of Africa in a 35-minute musical celebration of animal folklore, in the Moroccan Palace. Christiano converted the existing ice skating rink which was housed in the Moroccan Place, into a fully functional Broadway stage, renovating and enlarging the area and front row seating. Additional construction projects at Busch Gardens were upgrades to the Fest Haus and Zagora restroom facilities, and the construction of a 8' high perimeter wall.
- Buildings, 8,000 S. F. - Wall, 5,600 lineal square feet
- Construction Cost: $1,192,165
- Architect: Mills & Associates - Tampa, FL
|
|
 |
Adventure Island - Key West Rapids
Tampa, FL |
|
 |
Christiano constructed the Key West Rapids water slide, that will take the adventurous cascading down nearly six water-fueled stories, and tubing through more than 700 feet of gnarly twists, turns, speedy slopes, gushers, water mines, pools and showers before landing in a splash pool– an extra wide super slide.
- 700 lineal square feet
- Construction Cost: $1,200,000
- Architect: Pechkam Guyton Albers & Viets, Inc. - St. Louis, MO
|
|
 |
Adventure Island - Rambling Bayou
Tampa, FL |
|
 |
Float down the Rambling Bayou for a little rest and relaxation. Christiano constructed this calm, half-mile tube trip that will take you through a colorful rain forest featuring lush landscapes, tropical waterfalls … and even rain and fog.
- 2,640 lineal square feet
- Construction Cost: $2,800,000
- Architect: Pechkam Guyton Albers & Viets, Inc. - St. Louis, MO
|
|
 |