Young Rainey Star Center
Largo, FL |
|
 |
Christiano performed a major exterior renovation to the Star Center. The office complex was completely re-stuccoed and painted, and we incorporated the addition of four exterior stairwells/elevator shafts. The housing of the stairs and elevators is the focal point of the building, as each were painted different, bold and vivid colors, along with a very unique, modern, and high-tech design.
- 4,000 square feet
- Construction Cost: $1,149,180
- Architect: CBB Archtiects - St. Petersburg, FL