 |
 |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
 |
| |
| |
13790 Roosevelt Blvd.
Clearwater, FL 33762 |
| |
P: 727.573.3612
F: 727.573.7734 |
| |
GC# CGC008702 |
| |
|
|
 |
 |
We've Completed More than 77 Educational Projects |
 |
Baycrest Elementary School
Hillsborough County, FL |
|
 |
Our scope of work consists of the addition of a 12 Classroom building, complete with site/civil work, and renovations to the school campus. Improvements include major MEP upgrades, including new phone and cable system. New acoustical ceilings, doors, windows and vertical blinds, counter tops, casework, and interior and exterior furnishings. Roof replacements and accessories, metal walkway canopies, and commercial food service equipment.
- 61,229 square feet
- Construction Cost: $5,000,000
- Architect: Carruthers & Associates, Inc. - Tampa, FL
- More Pictures Available
|
|
 |
Brandon Sr. High School
Brandon, FL |
|
 |
This project consisted of 12 phases, including 4 sub phases. The phasing was necessary to keep the
air conditioning in operation while completing construction. The school required major exterior and interior renovations and improvements, and as the Construction Manager on this 18-month “fast track” project, we provided the re-roofing of the entire campus, asbestos abatement, upgrades to the fire alarm systems, telephone and intercom systems, and extensive HVAC replacement, including replacing circulating water piping systems, new chillers and duct work system.
- 265,000 square feet
- Construction Cost: $11,360,000
- Architect: Reynolds, Smith & Hills - Tampa, FL
- More Pictures Available
|
|
 |
Egypt Lake Elementary
Tampa, FL |
|
 |
Billed as a two-phased project, the first phase included constructing the Egypt Lake Partnership Library, which consisted of a computer lab area, and the addition of new covered walkways. During the second phase, Christiano was responsible for upgrading the telephone, fire alarm and intercom systems throughout the existing campus. We replaced all the rooftop HVAC units, and re-roofed the majority of the campus. Additionally, we were tasked with assisting in the phasing of the asbestos abatement, and made campus-wide restroom renovations.
- 40,086 square feet
- Construction Cost: $1,700,000
- Architect: Howard & Associates – Tampa, FL
- More Pictures Available
|
More Representative Projects...
 |
Project |
|
 |
 |
Location |
|
| |
USF Mental Health Institute |
|
 |
|
Tampa, FL |
|
| |
Clearwater Catholic High School |
|
 |
|
Clearwater, FL |
|
| |
Hillsborough Community College |
|
 |
|
Tampa, FL |
|
| |
Charlotte High School |
|
 |
|
Charlotte County, FL |
|
| |
Orange Ridge/Bullock Elementary |
|
 |
|
Bradenton, FL |
|
| |
H. B. Plant High School |
|
 |
|
Tampa, FL |
|
| |
Fort Myers Elementary |
|
 |
|
Fort Myers, FL |
|
| |
Dunedin Elementary |
|
 |
|
Dunedin, FL |
|
| |
St. Cecelia Catholic School |
|
 |
|
Clearwater, FL |
|
| |
Belleair Elementary |
|
 |
|
Belleair, FL |
|
| |
Largo High School |
|
 |
|
Largo, FL |
|
|
 |